Capilano University Film Centre Project

Scope: New building requiring containment on a structure spanning 70 ft high and 400 ft wide.

Challenges

The sheer size of the roof length was a challenge to plan and ensure it could be completed effectively and in a speedy manner.

In addition the elevated site allowed for the site being afforded by adverse weather conditions exposing the project to high moisture content, heavy rainfall and strong winds.

Actions

To ensure the roof was completed quickly the 450 system beam was used, the snap fittings allowed for ease in install.